Tuesday, March 15, 2016

Far from Short Handed

This week is off to a strong start with everyone busy at work. The hand team is printing and designing constantly, with the Wall-E hand design printed and heading to be tested. Steve's group is re scaling the ball and socket design to be printed. New designs are flying out, with a peg design, and a switch design in the making.

Paul's group is working on coding the log in page.

EYE is preparing for their meeting with the volunteers at Schuylerville for their upcoming program.

3D printers are still getting fixed and while Cam works on a build plate for a print out of an arm, Chudy researching finishing 3D printed parts.

1 comments:

Anonymous said...

Wow!